 |
The Stormwater Division as is a fee structured enterprise fund based on an Equivalent Rate Unit (ERU) of impervious area. One ERU is the fee for each developed residential location while developed commercial sites have a square footage ratio to the ERU applied. Other functions of the stormwater division include construction and maintenance of conveyance systems, adherence to soil and sedimentation standards, meeting National Pollutant Discharge Elimination System (NPDES) and future Total Maximum Daily Load (TMDL) permitting requirements. For further information on the Stormwater Utility see frequently asked questions.
Projects List
- Barton Stormwater Detention Facility
- Robert A. Anderson Park
- Indian River Lagoon Baffle Box Projects
- Street Sweeping
- Closed Circuit TV Records
- Field Inventory
|  |